- Location: York
- Timeline: 5 week programme over November 2019
- Size: 3,000 sq ft
Secerna
Secerna, a leading firm of Patent Attorneys based in York.
Our Challenge: Extremely tight timescales and combining CAT A & CAT B fit-outs including installation on Mezzanine office space.
How we helped: Secerna, the tenant and Clifford Street Ventures, the buildings developer and a subsidiary of Helmsley Group. In a back to front scenario we worked with both parties to design the CAT B fitout to reduce the total fitout costs and reduce the project timeline. This included installing a mezzanine floor to almost double the usable office floorspace. As Secerna are a leading Patent Attorney, the brief was to give a feel of protection whilst retaining the integrity of the newly developed former York Fire Station, opposite the famous Clifford’s Tower. This was a full design and build project delivered on time and on budget.
What we delivered:
- Full Design & Build Project
- Project Management
- Layout Design
- Interior Design and Specification
- Visualisation
- Furniture
- CAT A Fit Out
- CAT B Fit Out and Installation